In May of 2003, the old asphalt driveway was ripped apart and replaced with a new concrete driveway. The new driveway can hold three cars side-by-side at its widest point. |
Terry Ertel works on breaking up the asphalt and loading it into a dump truck. |
|
|
Mackenzie supervises Terry's work. |
The old basketball hoop and pole were removed to make room for the new driveway. Here, Terry uses a concrete saw to break apart the concrete holding the pole. |
|
|
A view of the driveway area after the asphalt had been removed. Notice the wood framing already in place for the new concrete pouring. |
Here, the concrete is poured into the wooden forms. |
|
The picture below shows a
transition between the asphalt driveway and the new concrete one.