Front and back walls were constructed and nailed into place.  The pictures at the right show the front and back walls after completion.  The front wall contained a large opening for the entrance to the shed.

Roof trusses were then nailed into place on top of the side wall ledges.  The first three trusses from each end contained cross-beams to allow for a loft at each end of the shed.
This picture shows the shed after completion of all of the framing work.

 