Time was taken at this point to build a flight of stairs for the small deck. |
The following weekend, laying down of the decking began. Here, the decking material is moved into the backyard for placement on the deck. |
|
|
Jim set to work cutting the decking boards to specifications. |
Scott, Jen, Joey, and Larry then attached the boards to the joists with decking screws. |
|
|
Here, Scott takes a PowerAde break.
Approximately 2/3 of the decking boards were laid, before it was necessary to stop and complete other work before making the final run on the decking.
|